Pratt & Whitney Fuel Nozzle Replacement


Tuesday, April 21, 2026
to Wednesday, April 22, 2026

Competitors Required:

1

Description:

This task requires the removal and replacement of the #4 fuel nozzle and gasket installed on the PW1100G-JM engine.

References:

Advisory Circular 43.13-1B – Acceptable Methods, Techniques, and Practices – Aircraft Inspection and Repair

Tools, Equipment, and Materials Provided:

  • Safety Cable Kit
  • Safety Cable Gun

Snap-on provided tooling (qty one in each of two pallets unless otherwise indicated):

PW1100 Engine

V2500 Engine

¼” Drive Ratchet (THL72)

¼” Drive Ratchet (THL72)

¼” 12 Point Deep Socket – ¼” Drive (STM8)

¼” 12 Point Deep Socket – ¼” Drive (STM8)

5/16” 12 Point Deep Socket – ¼” Drive (STM10)

5/16” 12 Point Deep Socket – ¼” Drive (STM10)

6” Extension - ¼” Drive (TMXK60)

6” Extension - ¼” Drive (TMXK60)

12” Extension - ¼” Drive (TMXK110)

12” Extension - ¼” Drive (TMXK110)

6” Extension – 3/8” Drive (FXK6)

6” Extension – 3/8” Drive (FXK6)

12” Extension – 3/8” Drive (FXK11)

12” Extension – 3/8” Drive (FXK11)

¾” Crowfoot Wrench – 3/8” Drive (FCO24A)

7/8” Crowfoot Wrench – 3/8” Drive (FCO28A)

¾” Angle Wrench (VS24B)

7/8” Angle Wrench (VS28B)

Torque Wrench 0-200 lbf-in. – ¼” Drive (QD1R200A)

Torque Wrench 0-200 lbf-in. – ¼” Drive (QD1R200A)

Torque Wrench 200-1000 in-lb. – 3/8” Drive (QD2R1000A)

Torque Wrench 200-1000 in-lb. – 3/8” Drive (QD2R1000A)

Diagonal Cutters (86ACF)

Diagonal Cutters (86ACF)

Procedures:

Instructions (Rev 00)

For More Information:

Kyle Ray

Kyle Ray

Pratt & Whitney - Team 1