Alaska Airlines Cabin Seat Repair


Tuesday, April 21, 2026
to Wednesday, April 22, 2026

Competitors Required:

1

Description:

Competitors will troubleshoot a recline system, identify the appropriate recline cable, and complete the replacement in accordance with the CMM.

References:

Seat Recline Cable Repair Procedure

Illustrated parts list

MIG-2A Seat Training form example sheet

Tools, Equipment, and Materials Provided:

  • 3/8 – 3/4 “30/60” ANGLE WRENCH SET
  • 3/8 - 3/4 RATCHETING WRENCH SET
  • 3/16 – 9/16 SHALLOW SOCKETS
  • ¼ INCH RATCHET
  • 6 PIECE ¼ INCH EXTENSION SET
  • 5/32 – 3/8 INCH ALLEN WRENCH SET
  • RATCHETING APEX BIT SCREWDRIVER
  • 2 INCH #2 PHILIPS APEX BIT X2
  • 4 INCH FLUSH CUTTERS
  • CF808 DIAGONAL CUTTERS
  • 4 PICK ASSORTMENT WITH TRAY
  • 8 INCH NEEDLE NOSE
  • PRESET TORQUE SCREWDRIVER AT 15 IN/LBS
  • FLASHLIGHT
  • FOD BUCKET

 

Snap-on provided tooling (qty one in each of two pallets unless otherwise indicated): none

Procedures:

Troubleshoot seat, use provided IPL and CMM to find effective part to be replaced and make logbook entry after work is completed.

Last updated: 4/10/2026

For More Information:

Christopher Riverski

Alaska Airlines